OUR BUSINESS SCOPE
OIL & GAS

 
MUGLAD BASIN OIL DEVELOPMENT – FIELD SURFACE FACILITIES (FSF) PHASE 3A PROJECT, SUDAN

Client - Greater Nile Petroleum Operating Co. Ltd, GNPOC
Scope of Works - Procurement, Construction and Commissioning of Crude Oil Upstream Wellhead Tie-in of over 50 oil wells including underground flowlines, above ground piping and electrical facilities, 33kV power distribution, Chemical Injection and separators
Contract Duration - May 2003 – Dec 2006

   
 
MALA FIELD DEVELOPMENT PROJECT – FIELD SURFACE FACILITIES, SUDAN

Client - White Nile (5B) Petroleum Operating Company (WNPOC)
Scope of Works - EPCC of Crude Oil Upstream Wellhead Tie-in including Degassing and Gas Flaring Facilities, Crude Oil Pump station, Product Metering, Chemical Injection, 33kV Power, Transmission and Distribution, plant Distributed Control and Emergency Shutdown System
Contract Duration - Oct 2005 – Apr 2007

   
 
LIQUID BULK TERMINAL PROJECT, WEST PORT, MALAYSIA

Client - Stolthaven (Westport) Sdn Bhd
Scope of Works - Complete procurement and construction scope covering civil, buildings, 35 liquid tanks, piping systems, loading systems, weigh bridge, fire fighting, electrical, pumps installation, nitrogen blanketing and instrumentation works
Contract Duration - Apr 1997 – Nov 1997

   
 
MG3 LUBE PLANT PROJECT, MALAYSIA

Client - Petronas Penapisan Melaka Sdn Bhd (Larsen & Toubro Ltd)
Scope of Works - Procurement and Construction of 11 nos carbon steel storage tanks for Units 72 and 49
Contract Duration - Dec 06 – Nov 07

 
   
 
LNG3 BERTH BINTULU PORT, BINTULU, SARAWAK

Client - Bintulu Port Authority
Scope of Works - 650m long jetty come with platform, dolphin, catwalk, etc
Contract Duration - Sept 1999 – Aug 2001

   
 